spcaer

top
Operon Logo
Press and PR
Specer
d   Home    
  Services    
  People    
  Careers    
  Accreditation    
  Experience    
image
  Group Information    
image
  Meaning of Operon    
image
  Integrated Management Systems    
  Contact Us    
 
   
 

NYOP education were appointed by Aberdeen City Council as preferred bidder for the £120 million Aberdeen 3RS PPP (Private Public Partnership), comprising of 9 new build primary and secondary schools, one school refurbishment and one sports centre refurbishment.

Due to commence on site late 2007, the multi central design and construction team brings Scandinavian and British quality together to provide schools of the future achieving ‘Excellent’ BREEAM ratings on all new builds.

The two secondary schools are being constructed using a prefabricated structure designed by Bur Happold and built by the Danish Contractor PIHL and Sons Ltd to be constructed of a prefabricated Glulam timber frame and shall be constructed by Scottish builders Stewart Milne Construction.

The schools are designed utilising natural ventilation principles via a combination of manual opening windows and automatic roof lights.

Heating is provided by an under floor heating system fed from a gas fired central boiler plant with local individual room control provided.

Domestic hot water is generated by indirect hot water calorifiers with the incoming mains cold water pre-heated via solar hot water collector panels located at roof level.  Rainwater recycling systems are provided to collect and utilise rainwater for WC flushing to minimise water consumption.

Electrical services include LV distribution, small power, Cat 6, IT data installation, high efficiency internal and external installation, emergency lighting, fire alarms, security and access control.

Central building Management Systems are provided for automatic control and monitoring of all the building services installations.

Location: Aberdeen, Scotland
Project No: J000410

image

Contract Details:
Start Date: July 2007
Completion Date: March 2009
Contract Period: 21 months
Construction Contract Value: £120 Million
M&E Contract Value: £20 Million

Project Team:
Client: Aberdeen City Council
Architect: Aedas / Designa / Acanthus DF
Building Services Consultants: OPERON Design
Structural Engineers: Buro Happold
Main Contractors: PIHL & Son Ltd / Stewart Milne
M&E Contractor: TBC

 
   
Designed by inceptum solutions